{"id":5233,"date":"2026-08-31T10:34:13","date_gmt":"2026-08-31T02:34:13","guid":{"rendered":"https:\/\/metobrew.com\/?p=5233"},"modified":"2026-08-31T10:43:42","modified_gmt":"2026-08-31T02:43:42","slug":"africa-brewery-equipment-solutions-turnkey-brewing-systems","status":"publish","type":"post","link":"https:\/\/metobrew.com\/pt\/africa-brewery-equipment-solutions-turnkey-brewing-systems\/","title":{"rendered":"Africa Brewery Equipment Solutions | Turnkey Brewing Systems"},"content":{"rendered":"<p>Across Africa, brewing and fermented beverages have long been part of local food traditions, social gatherings, and community life. From sorghum-based traditional beers to palm-based beverages, local ingredients and production methods reflect the diversity of African markets.<\/p>\n\n\n\n<p>At the same time, the commercial beverage sector is changing.<\/p>\n\n\n\n<p>Urbanization, hospitality development, tourism, modern retail, and growing consumer expectations are creating opportunities for breweries that can deliver consistent quality at a commercially viable cost. For many producers, the challenge is no longer simply how to make beer or fermented beverages. It is how to produce consistently, increase capacity, maintain hygiene, and control operating costs as the business grows.<\/p>\n\n\n\n<p>This is where modern brewery equipment can make a practical difference.<\/p>\n\n\n\n<p>The objective is not to replace traditional brewing knowledge. Instead, properly engineered brewing equipment gives producers greater control over the processes that determine consistency, efficiency, and scalability.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What Challenges Are African Breweries Facing?<\/h2>\n\n\n\n<p>Every brewery has different operating conditions, but several challenges commonly become more important as production moves from small-batch manufacturing toward commercial volumes.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Batch Consistency<\/h3>\n\n\n\n<p>Manual brewing relies heavily on operator experience. While skilled brewers can achieve excellent results, maintaining exactly the same temperature, timing, wort separation, fermentation conditions, and cleaning procedures from batch to batch becomes increasingly difficult as production increases.<\/p>\n\n\n\n<p>A properly designed brewhouse provides controlled process parameters. Temperature sensors, pumps, valves, heat exchangers, and automated or semi-automated controls can reduce unnecessary process variation.<\/p>\n\n\n\n<p>The goal is simple: make the brewing process repeatable without removing the brewer&#8217;s control over the recipe.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Limited Production Capacity<\/h3>\n\n\n\n<p>A brewery can have strong demand but still lose sales if its production capacity cannot keep up.<\/p>\n\n\n\n<p>Increasing capacity does not necessarily mean installing the largest possible system. A more practical approach is to calculate:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Target annual production<\/li>\n\n\n\n<li>Brewhouse batch size<\/li>\n\n\n\n<li>Number of brews per day<\/li>\n\n\n\n<li>Fermentation cycle<\/li>\n\n\n\n<li>Tank utilization<\/li>\n\n\n\n<li>Packaging capacity<\/li>\n\n\n\n<li>Expected future expansion<\/li>\n<\/ul>\n\n\n\n<p>For example, a brewery may choose a 1,000L or 2,000L brewhouse while installing additional fermentation tanks in phases. This can provide a more manageable investment path than building an oversized facility from day one.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Hygiene and Cleaning<\/h3>\n\n\n\n<p>As production increases, cleaning becomes a production issue rather than simply a maintenance task.<\/p>\n\n\n\n<p>Product-contact surfaces should be designed for effective cleaning, with suitable sanitary fittings, drainage, spray devices, piping arrangements, and CIP capability.<\/p>\n\n\n\n<p>A well-designed <strong>Sistema CIP<\/strong> can reduce manual cleaning work and improve process repeatability while helping the brewery establish documented cleaning procedures.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Energy and Utility Costs<\/h3>\n\n\n\n<p>Heating, cooling, pumping, compressed air, water, and refrigeration can represent significant operating costs.<\/p>\n\n\n\n<p>For this reason, equipment selection should consider the entire utility system rather than focusing only on the brewhouse.<\/p>\n\n\n\n<p>Hot liquor tanks, cold liquor tanks, glycol systems, plate heat exchangers, steam systems, pumps, insulation, and control systems should be sized according to the actual production schedule.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Modern Brewery Equipment for African Production<\/h2>\n\n\n\n<p>A commercial brewery is not simply a collection of individual machines. The equipment needs to work together as one process.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Sistema de cervejaria<\/h3>\n\n\n\n<p>The brewhouse is the core of the brewing process.<\/p>\n\n\n\n<p>Depending on production volume and workflow, breweries can choose 2-vessel, 3-vessel, 4-vessel, or more advanced configurations.<\/p>\n\n\n\n<p>A typical system may include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Milling system<\/li>\n\n\n\n<li>Mash or mash-kettle vessel<\/li>\n\n\n\n<li>Lauter tun<\/li>\n\n\n\n<li>Boil kettle<\/li>\n\n\n\n<li>Banheira de hidromassagem<\/li>\n\n\n\n<li>Wort pump<\/li>\n\n\n\n<li>Plate heat exchanger<\/li>\n\n\n\n<li>Hot liquor tank<\/li>\n\n\n\n<li>Sistema de controlo<\/li>\n<\/ul>\n\n\n\n<p>The right configuration depends on production frequency, available space, heating method, labor availability, and expansion plans.<\/p>\n\n\n\n<p>For a startup brewery, a semi-automatic system may provide a better balance between investment and operational flexibility. Larger commercial breweries may benefit from PLC-controlled systems to improve process monitoring and reduce repetitive manual operations.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Tanques de fermenta\u00e7\u00e3o<\/h3>\n\n\n\n<p>Fermentation is where process control becomes particularly important.<\/p>\n\n\n\n<p>Modern conical fermentation tanks can provide controlled temperature management, pressure capability, yeast collection, carbonation options, and easier cleaning.<\/p>\n\n\n\n<p>For commercial breweries, the number of fermentation tanks is often as important as the brewhouse capacity.<\/p>\n\n\n\n<p>For example, a 2,000L brewhouse does not automatically mean that two 2,000L fermenters are sufficient. The required tank volume depends on fermentation time, lagering requirements, packaging schedule, and desired production frequency.<\/p>\n\n\n\n<p>This is why fermentation capacity should be calculated from the production plan rather than selected independently.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Sistema de arrefecimento<\/h3>\n\n\n\n<p>African climates can create additional demands on refrigeration systems, particularly where ambient temperatures remain high.<\/p>\n\n\n\n<p>A brewery may require:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Refrigerador de glicol<\/li>\n\n\n\n<li>Glycol storage tank<\/li>\n\n\n\n<li>Fermentation cooling jackets<\/li>\n\n\n\n<li>Cold liquor tank<\/li>\n\n\n\n<li>Wort cooling system<\/li>\n\n\n\n<li>Tubagem isolada<\/li>\n<\/ul>\n\n\n\n<p>The refrigeration system should be selected based on the actual heat load, fermentation schedule, ambient conditions, and desired cooling performance.<\/p>\n\n\n\n<p>Oversizing and undersizing can both create unnecessary costs, so engineering calculations matter.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Designing for Local Operating Conditions<\/h2>\n\n\n\n<p>One of the biggest advantages of working with an experienced brewery equipment manufacturer is the ability to adapt the system to the project environment.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Power Supply<\/h3>\n\n\n\n<p>Electrical specifications should be confirmed before equipment production.<\/p>\n\n\n\n<p>Voltage, frequency, phase configuration, available power capacity, control components, motors, pumps, and heating equipment all need to match the local electrical infrastructure.<\/p>\n\n\n\n<p>Where power stability is a concern, the brewery design can also consider appropriate electrical protection and control strategies.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Local Raw Materials<\/h3>\n\n\n\n<p>Not every brewery uses the same ingredients.<\/p>\n\n\n\n<p>Depending on the country and product concept, producers may work with barley malt, sorghum, maize, millet, fruit, spices, or other locally available ingredients.<\/p>\n\n\n\n<p>This can affect milling, mashing, filtration, pumping, and recipe design.<\/p>\n\n\n\n<p>Equipment should therefore be engineered around the actual raw material and process, rather than simply copying a standard brewery configuration.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Water Quality<\/h3>\n\n\n\n<p>Water is one of the most important raw materials in brewing.<\/p>\n\n\n\n<p>Before final equipment selection, the water source should be evaluated for parameters such as hardness, alkalinity, pH, mineral composition, and microbiological quality.<\/p>\n\n\n\n<p>Where necessary, water treatment equipment can be integrated into the overall brewery design.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">From Brewhouse to Packaging: Building a Complete Production Line<\/h2>\n\n\n\n<p>Producing consistent beer is only part of the commercial equation. The finished product also needs to reach customers efficiently.<\/p>\n\n\n\n<p>Depending on the target market, a brewery may require:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Keg filling system<\/li>\n\n\n\n<li>Bottle filling line<\/li>\n\n\n\n<li>Can filling line<\/li>\n\n\n\n<li>Pasteurization system<\/li>\n\n\n\n<li>Labeling equipment<\/li>\n\n\n\n<li>Packaging equipment<\/li>\n\n\n\n<li>Finished-product storage<\/li>\n<\/ul>\n\n\n\n<p>For breweries targeting restaurants, bars, hotels, and taprooms, keg packaging may be particularly important.<\/p>\n\n\n\n<p>For supermarkets and retail distribution, cans or bottles can provide greater flexibility.<\/p>\n\n\n\n<p>The packaging system should therefore be selected according to the brewery&#8217;s sales channels rather than simply according to production capacity.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"800\" height=\"600\" src=\"https:\/\/metobrew.com\/wp-content\/uploads\/2026\/04\/1000l-brewery-2.webp\" alt=\"1000l brewery (2)\" class=\"wp-image-4531\" srcset=\"https:\/\/metobrew.com\/wp-content\/uploads\/2026\/04\/1000l-brewery-2.webp 800w, https:\/\/metobrew.com\/wp-content\/uploads\/2026\/04\/1000l-brewery-2-768x576.webp 768w, https:\/\/metobrew.com\/wp-content\/uploads\/2026\/04\/1000l-brewery-2-16x12.webp 16w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Why Chinese Brewery Equipment Is Becoming an Attractive Option<\/h2>\n\n\n\n<p>For many international brewery investors, equipment sourcing is a balance between quality, customization, delivery capability, and total project cost.<\/p>\n\n\n\n<p>Chinese manufacturers can offer several advantages when the supplier has established engineering and international project experience.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Competitive Project Cost<\/h3>\n\n\n\n<p>Manufacturing scale and an established stainless steel fabrication supply chain can make Chinese brewery equipment commercially competitive.<\/p>\n\n\n\n<p>However, comparing suppliers purely by equipment price can be misleading.<\/p>\n\n\n\n<p>The more useful comparison is total project value, including:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Equipment configuration<\/li>\n\n\n\n<li>Material specification<\/li>\n\n\n\n<li>N\u00edvel de automatiza\u00e7\u00e3o<\/li>\n\n\n\n<li>Consumo de servi\u00e7os p\u00fablicos<\/li>\n\n\n\n<li>Shipping<\/li>\n\n\n\n<li>Installation<\/li>\n\n\n\n<li>Commissioning<\/li>\n\n\n\n<li>Training<\/li>\n\n\n\n<li>Spare parts<\/li>\n\n\n\n<li>Long-term technical support<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Flexible Automation<\/h3>\n\n\n\n<p>Not every brewery needs a fully automated production line.<\/p>\n\n\n\n<p>A startup may prefer manual or semi-automatic operation to reduce initial investment and give brewers greater hands-on control.<\/p>\n\n\n\n<p>A larger commercial brewery may require PLC control, automatic temperature regulation, recipe management, automated valve control, and process monitoring.<\/p>\n\n\n\n<p>The automation level should follow the brewery&#8217;s production requirements and available operating team.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Turnkey Brewery Solutions<\/h3>\n\n\n\n<p>For overseas projects, buying individual machines from different suppliers can create unnecessary engineering risks.<\/p>\n\n\n\n<p>A turnkey brewery equipment manufacturer can coordinate:<\/p>\n\n\n\n<p>Process design \u2192 Equipment manufacturing \u2192 Factory inspection \u2192 Export packing \u2192 International shipping \u2192 Installation \u2192 Commissioning \u2192 Operator training<\/p>\n\n\n\n<p>This integrated approach helps ensure that individual systems are compatible before they arrive at the brewery.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"800\" height=\"600\" src=\"https:\/\/metobrew.com\/wp-content\/uploads\/2026\/03\/5000l-brewery-equipment-1.webp\" alt=\"5000l equipamento para cervejaria 1\" class=\"wp-image-4374\" srcset=\"https:\/\/metobrew.com\/wp-content\/uploads\/2026\/03\/5000l-brewery-equipment-1.webp 800w, https:\/\/metobrew.com\/wp-content\/uploads\/2026\/03\/5000l-brewery-equipment-1-768x576.webp 768w, https:\/\/metobrew.com\/wp-content\/uploads\/2026\/03\/5000l-brewery-equipment-1-16x12.webp 16w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">METO: Brewery Equipment Engineering for International Projects<\/h2>\n\n\n\n<p>METO focuses on the design and manufacturing of commercial brewery equipment and stainless steel processing systems for international customers.<\/p>\n\n\n\n<p>Its brewery solutions can be configured for different production scales, from small craft brewing operations to larger commercial facilities.<\/p>\n\n\n\n<p>Depending on the project, the equipment package can include the brewhouse, fermentation tanks, glycol cooling system, CIP system, water and utility equipment, piping, control system, and packaging-related equipment.<\/p>\n\n\n\n<p>The engineering process starts with the customer&#8217;s production requirements rather than a fixed equipment package.<\/p>\n\n\n\n<p>Key project parameters include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Capacidade de produ\u00e7\u00e3o<\/li>\n\n\n\n<li>Beer styles<\/li>\n\n\n\n<li>Raw materials<\/li>\n\n\n\n<li>Frequ\u00eancia de prepara\u00e7\u00e3o<\/li>\n\n\n\n<li>Fermentation period<\/li>\n\n\n\n<li>\u00c1rea \u00fatil dispon\u00edvel<\/li>\n\n\n\n<li>Local electrical specifications<\/li>\n\n\n\n<li>Heating source<\/li>\n\n\n\n<li>Water conditions<\/li>\n\n\n\n<li>Formato de embalagem<\/li>\n\n\n\n<li>Future expansion plans<\/li>\n<\/ul>\n\n\n\n<p>This information is then used to develop the process flow, equipment configuration, tank capacity, utility requirements, and layout.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to Start a Brewery Equipment Project in Africa<\/h2>\n\n\n\n<p>A commercial brewery project becomes much easier to manage when the planning process is clearly structured.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Step 1: Define Your Production Target<\/h3>\n\n\n\n<p>Start with the amount of beer you intend to produce rather than choosing equipment based only on tank size.<\/p>\n\n\n\n<p>For example, determine your expected annual output, number of brewing days, batch size, fermentation time, and packaging schedule.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Step 2: Evaluate the Site<\/h3>\n\n\n\n<p>The equipment supplier should understand the available building before finalizing the design.<\/p>\n\n\n\n<p>Important information includes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Building dimensions<\/li>\n\n\n\n<li>Ceiling height<\/li>\n\n\n\n<li>Floor loading<\/li>\n\n\n\n<li>Drenagem<\/li>\n\n\n\n<li>Water supply<\/li>\n\n\n\n<li>Electrical supply<\/li>\n\n\n\n<li>Heating fuel availability<\/li>\n\n\n\n<li>Equipment access<\/li>\n\n\n\n<li>Storage areas<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Step 3: Develop the Process and Equipment List<\/h3>\n\n\n\n<p>The supplier can then develop the process flow and determine the appropriate configuration for the brewhouse, fermentation cellar, cooling system, CIP, utilities, and packaging.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Step 4: Manufacturing and Inspection<\/h3>\n\n\n\n<p>Before shipment, equipment should be inspected against the agreed specifications.<\/p>\n\n\n\n<p>Depending on the project, inspection can cover dimensions, welding quality, surface finishing, pressure testing, electrical systems, control functions, and component specifications.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Step 5: Installation and Training<\/h3>\n\n\n\n<p>International brewery projects do not end when the equipment reaches the port.<\/p>\n\n\n\n<p>Installation, commissioning, recipe setup, cleaning procedures, basic troubleshooting, and operator training are all important parts of successful project delivery.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Building Africa\u2019s Next Generation of Breweries<\/h2>\n\n\n\n<p>Africa&#8217;s brewing industry does not need a single equipment model.<\/p>\n\n\n\n<p>A small brewpub, a regional craft brewery, and a large commercial producer have completely different investment priorities and production requirements.<\/p>\n\n\n\n<p>The right brewery equipment solution should therefore be built around the business itself.<\/p>\n\n\n\n<p>Modern technology can provide better temperature control, repeatable processes, improved cleaning, higher production efficiency, and a clear path for future expansion\u2014while still allowing brewers to preserve the character of their recipes and local ingredients.<\/p>\n\n\n\n<p>For investors and brewery owners planning a new facility or upgrading an existing plant, the first step is not choosing a machine. It is defining the production target, process requirements, site conditions, and long-term business plan.<\/p>\n\n\n\n<p>METO can provide a customized brewery equipment solution based on your production capacity, beer style, site conditions, utilities, and budget. <strong>If you are planning to build or upgrade a brewery in Africa, <a href=\"https:\/\/metobrew.com\/pt\/contact\/\" data-type=\"page\" data-id=\"237\">contact METO <\/a>for a preliminary equipment proposal and process layout.<\/strong><\/p>\n\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Explore brewery equipment solutions for Africa, from brewhouses and fermentation tanks to cooling, CIP and turnkey brewery systems tailored to local needs.<\/p>","protected":false},"author":5,"featured_media":4390,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_robots_primary_cat":"none","_seopress_titles_title":"Africa Brewery Equipment Solutions | Turnkey Brewing Systems","_seopress_titles_desc":"Explore brewery equipment solutions for Africa, from brewhouses and fermentation tanks to cooling, CIP and turnkey brewery systems tailored to local needs.s.","_seopress_robots_index":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"default","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[27],"tags":[46],"class_list":["post-5233","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-brewery-equipment"],"acf":[],"_links":{"self":[{"href":"https:\/\/metobrew.com\/pt\/wp-json\/wp\/v2\/posts\/5233","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/metobrew.com\/pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/metobrew.com\/pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/metobrew.com\/pt\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/metobrew.com\/pt\/wp-json\/wp\/v2\/comments?post=5233"}],"version-history":[{"count":2,"href":"https:\/\/metobrew.com\/pt\/wp-json\/wp\/v2\/posts\/5233\/revisions"}],"predecessor-version":[{"id":5235,"href":"https:\/\/metobrew.com\/pt\/wp-json\/wp\/v2\/posts\/5233\/revisions\/5235"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/metobrew.com\/pt\/wp-json\/wp\/v2\/media\/4390"}],"wp:attachment":[{"href":"https:\/\/metobrew.com\/pt\/wp-json\/wp\/v2\/media?parent=5233"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/metobrew.com\/pt\/wp-json\/wp\/v2\/categories?post=5233"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/metobrew.com\/pt\/wp-json\/wp\/v2\/tags?post=5233"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}