{"id":5339,"date":"2026-10-08T13:52:34","date_gmt":"2026-10-08T05:52:34","guid":{"rendered":"https:\/\/metobrew.com\/?p=5339"},"modified":"2026-10-08T13:53:27","modified_gmt":"2026-10-08T05:53:27","slug":"what-is-included-in-a-turnkey-brewery-equipment-project","status":"publish","type":"post","link":"https:\/\/metobrew.com\/it\/what-is-included-in-a-turnkey-brewery-equipment-project\/","title":{"rendered":"What Is Included in a Turnkey Brewery Equipment Project?"},"content":{"rendered":"<p>When planning a new brewery, buyers often come across the term \u201cturnkey brewery equipment.\u201d However, the meaning of turnkey can vary significantly between suppliers.<\/p>\n\n\n\n<p>For some suppliers, turnkey may simply mean a complete set of brewing vessels. For others, it can include equipment design, production, piping, automation, installation, commissioning and operator training.<\/p>\n\n\n\n<p>For an international brewery project, understanding what is actually included is important before comparing quotations or placing an equipment order.<\/p>\n\n\n\n<p>A well-planned turnkey brewery project should connect the major production systems into one integrated solution, from raw water and brewing to fermentation, cooling, CIP and final beer handling.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What Does \u201cTurnkey Brewery\u201d Mean?<\/h2>\n\n\n\n<p>A turnkey brewery is an integrated brewery equipment solution designed to reduce the amount of engineering and coordination required from the buyer.<\/p>\n\n\n\n<p>Instead of purchasing individual tanks from different suppliers, the brewery equipment manufacturer coordinates the major systems according to the brewery&#8217;s production requirements.<\/p>\n\n\n\n<p>A turnkey project may include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Brewery system design<\/li>\n\n\n\n<li>Birreria<\/li>\n\n\n\n<li>Fermentation tanks<\/li>\n\n\n\n<li>Bright beer tanks<\/li>\n\n\n\n<li>Hot and cold water systems<\/li>\n\n\n\n<li>Glycol cooling<\/li>\n\n\n\n<li>Sistema CIP<\/li>\n\n\n\n<li>Pumps and piping<\/li>\n\n\n\n<li>Sistema di controllo<\/li>\n\n\n\n<li>Electrical integration<\/li>\n\n\n\n<li>Equipment testing<\/li>\n\n\n\n<li>Installation support<\/li>\n\n\n\n<li>Commissioning<\/li>\n\n\n\n<li>Operator training<\/li>\n<\/ul>\n\n\n\n<p>The exact scope depends on the brewery size, automation level, local utilities and project requirements.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">1. Brewery Process Design<\/h2>\n\n\n\n<p>A turnkey project should begin with process design rather than equipment production.<\/p>\n\n\n\n<p>The manufacturer should first understand:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Target annual production<\/li>\n\n\n\n<li>Brewhouse capacity<\/li>\n\n\n\n<li>Batches per day<\/li>\n\n\n\n<li>Beer styles<\/li>\n\n\n\n<li>Fermentation time<\/li>\n\n\n\n<li>Number and size of fermenters<\/li>\n\n\n\n<li>Packaging requirements<\/li>\n\n\n\n<li>Available factory space<\/li>\n\n\n\n<li>Heating method<\/li>\n\n\n\n<li>Cooling requirements<\/li>\n\n\n\n<li>Livello di automazione<\/li>\n\n\n\n<li>Future expansion plans<\/li>\n<\/ul>\n\n\n\n<p>These factors determine how the individual systems should work together.<\/p>\n\n\n\n<p>For example, a 1,000L brewhouse does not automatically mean the brewery needs 1,000L of fermentation capacity. The number of fermenters, fermentation time and production schedule must also be considered.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">2. Brewhouse System<\/h2>\n\n\n\n<p>The brewhouse is the core of the brewing process.<\/p>\n\n\n\n<p>Depending on the brewery size and production requirements, a turnkey system may include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Mill<\/li>\n\n\n\n<li>Tino di ammostamento<\/li>\n\n\n\n<li>Agire con maggiore sincerit\u00e0<\/li>\n\n\n\n<li>Kettle<\/li>\n\n\n\n<li>Whirlpool<\/li>\n\n\n\n<li>Hot liquor tank<\/li>\n\n\n\n<li>Cold liquor tank<\/li>\n\n\n\n<li>Wort pumps<\/li>\n\n\n\n<li>Heat exchanger<\/li>\n\n\n\n<li>Wort aeration system<\/li>\n\n\n\n<li>Brewhouse control system<\/li>\n<\/ul>\n\n\n\n<p>The brewhouse configuration can be customized according to production volume, available space, heating method and desired automation.<\/p>\n\n\n\n<p>For example, smaller breweries may use a compact two-vessel or three-vessel system, while larger commercial breweries may require four-vessel or five-vessel configurations for higher production efficiency.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">3. Fermentation and Cellar Equipment<\/h2>\n\n\n\n<p>Fermentation is one of the most important parts of the brewery.<\/p>\n\n\n\n<p>A turnkey brewery project may include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Fermentatori conici<\/li>\n\n\n\n<li>Bright beer tanks<\/li>\n\n\n\n<li>Horizontal lagering tanks<\/li>\n\n\n\n<li>Yeast handling equipment<\/li>\n\n\n\n<li>Carbonation systems<\/li>\n\n\n\n<li>Tank temperature control<\/li>\n\n\n\n<li>Glycol piping<\/li>\n<\/ul>\n\n\n\n<p>The number of fermenters should be determined based on production volume and fermentation time.<\/p>\n\n\n\n<p>A brewery that produces several batches per day may require significantly more fermentation capacity than a brewery with the same brewhouse size but a slower production schedule.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">4. Glycol Cooling System<\/h2>\n\n\n\n<p>A complete brewery cannot be properly designed without considering cooling requirements.<\/p>\n\n\n\n<p>The cooling system may include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Glycol chiller<\/li>\n\n\n\n<li>Glycol storage tank<\/li>\n\n\n\n<li>Glycol pump<\/li>\n\n\n\n<li>Heat exchanger<\/li>\n\n\n\n<li>Glycol piping<\/li>\n\n\n\n<li>Tank cooling jackets<\/li>\n\n\n\n<li>Temperature control system<\/li>\n<\/ul>\n\n\n\n<p>The chiller should be sized according to the actual cooling load rather than brewhouse capacity alone.<\/p>\n\n\n\n<p>The calculation should consider the number and size of fermenters, fermentation temperature, cold crashing, wort cooling and the local ambient conditions.<\/p>\n\n\n\n<p>For breweries in hot climates such as Thailand, cooling capacity and insulation require particular attention.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">5. Hot and Cold Water Systems<\/h2>\n\n\n\n<p>Water is used throughout the brewing process and should be considered as part of the overall system.<\/p>\n\n\n\n<p>Depending on the project, a turnkey solution may include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Hot liquor tank<\/li>\n\n\n\n<li>Cold liquor tank<\/li>\n\n\n\n<li>Brewing water pumps<\/li>\n\n\n\n<li>Water piping<\/li>\n\n\n\n<li>Water filtration<\/li>\n\n\n\n<li>Water treatment equipment<\/li>\n<\/ul>\n\n\n\n<p>The hot water system should have sufficient capacity to support the planned brewing schedule.<\/p>\n\n\n\n<p>Water treatment may also be required depending on the source water and the beer styles being produced.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">6. Sistema di pulizia CIP<\/h2>\n\n\n\n<p>A brewery needs an effective cleaning system to maintain sanitation and production consistency.<\/p>\n\n\n\n<p>A turnkey CIP system may include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>CIP tanks<\/li>\n\n\n\n<li>Caustic tank<\/li>\n\n\n\n<li>Acid tank<\/li>\n\n\n\n<li>Serbatoio dell'acqua calda<\/li>\n\n\n\n<li>CIP pump<\/li>\n\n\n\n<li>Spray devices<\/li>\n\n\n\n<li>Cleaning pipelines<\/li>\n\n\n\n<li>Valvole<\/li>\n\n\n\n<li>Controllo della temperatura<\/li>\n<\/ul>\n\n\n\n<p>For larger breweries, the CIP system can be integrated with PLC control to manage cleaning sequences and reduce manual operation.<\/p>\n\n\n\n<p>The final CIP configuration should be based on the number of vessels, tank volume, cleaning frequency and whether multiple cleaning circuits are required.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"800\" height=\"600\" src=\"https:\/\/metobrew.com\/wp-content\/uploads\/2026\/09\/cip_.webp\" alt=\"cip \" class=\"wp-image-5241\" srcset=\"https:\/\/metobrew.com\/wp-content\/uploads\/2026\/09\/cip_.webp 800w, https:\/\/metobrew.com\/wp-content\/uploads\/2026\/09\/cip_-768x576.webp 768w, https:\/\/metobrew.com\/wp-content\/uploads\/2026\/09\/cip_-16x12.webp 16w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">7. Pumps, Valves and Process Piping<\/h2>\n\n\n\n<p>Pumps and piping are sometimes overlooked when buyers compare brewery quotations.<\/p>\n\n\n\n<p>However, they are essential for connecting the entire production system.<\/p>\n\n\n\n<p>A turnkey brewery may require piping for:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Wort<\/li>\n\n\n\n<li>Beer<\/li>\n\n\n\n<li>Acqua<\/li>\n\n\n\n<li>Glycol<\/li>\n\n\n\n<li>CIP<\/li>\n\n\n\n<li>Vapore<\/li>\n\n\n\n<li>Compressed air<\/li>\n\n\n\n<li>CO\u2082<\/li>\n<\/ul>\n\n\n\n<p>The manufacturer should define the piping materials, connection standards, valve types and process routes according to the brewery design.<\/p>\n\n\n\n<p>Proper piping design can improve cleaning efficiency, reduce product loss and make future maintenance easier.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">8. Electrical System and PLC Automation<\/h2>\n\n\n\n<p>Automation can range from basic temperature control to a centralized PLC system.<\/p>\n\n\n\n<p>A turnkey brewery control system may include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>PLC<\/li>\n\n\n\n<li>HMI touchscreen<\/li>\n\n\n\n<li>Sensori di temperatura<\/li>\n\n\n\n<li>Pressure sensors<\/li>\n\n\n\n<li>Flow meters<\/li>\n\n\n\n<li>Automatic valves<\/li>\n\n\n\n<li>Pump control<\/li>\n\n\n\n<li>Heating control<\/li>\n\n\n\n<li>Glycol control<\/li>\n\n\n\n<li>CIP control<\/li>\n\n\n\n<li>Alarm functions<\/li>\n<\/ul>\n\n\n\n<p>The automation level should match the brewery&#8217;s production scale and operating model.<\/p>\n\n\n\n<p>A small brewpub may only need basic temperature and pump control, while a larger commercial brewery may benefit from centralized automation covering the brewhouse, cellar, cooling and CIP systems.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">9. Factory Acceptance Testing<\/h2>\n\n\n\n<p>Factory testing is particularly important for international brewery projects.<\/p>\n\n\n\n<p>Before shipment, the manufacturer can perform a factory acceptance process to verify that the equipment meets the agreed specifications.<\/p>\n\n\n\n<p>Depending on the project scope, FAT may include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Equipment dimensions<\/li>\n\n\n\n<li>Tank configuration<\/li>\n\n\n\n<li>Welding quality<\/li>\n\n\n\n<li>Surface finish<\/li>\n\n\n\n<li>Pressure testing<\/li>\n\n\n\n<li>Pumps<\/li>\n\n\n\n<li>Valvole<\/li>\n\n\n\n<li>Sensors<\/li>\n\n\n\n<li>Control panels<\/li>\n\n\n\n<li>PLC functions<\/li>\n\n\n\n<li>Componenti elettrici<\/li>\n\n\n\n<li>Water testing<\/li>\n\n\n\n<li>Documentation<\/li>\n<\/ul>\n\n\n\n<p>A clear FAT procedure helps identify potential problems before the equipment leaves the factory.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">10. Brewery Equipment Documentation<\/h2>\n\n\n\n<p>A turnkey project should not end with physical equipment alone.<\/p>\n\n\n\n<p>International buyers may require technical documentation such as:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Equipment drawings<\/li>\n\n\n\n<li>P&amp;ID<\/li>\n\n\n\n<li>Electrical drawings<\/li>\n\n\n\n<li>Operation manuals<\/li>\n\n\n\n<li>Maintenance instructions<\/li>\n\n\n\n<li>Equipment specifications<\/li>\n\n\n\n<li>Material documentation where applicable<\/li>\n\n\n\n<li>Pressure test records<\/li>\n\n\n\n<li>Testing records<\/li>\n\n\n\n<li>Component lists<\/li>\n\n\n\n<li>Spare parts lists<\/li>\n<\/ul>\n\n\n\n<p>The exact documentation depends on the equipment type, destination market and project requirements.<\/p>\n\n\n\n<p>For projects involving pressure equipment or specific local regulations, the required documentation should be confirmed before manufacturing begins.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">11. Shipping and Export Preparation<\/h2>\n\n\n\n<p>For an international turnkey brewery project, equipment must also be prepared for transportation.<\/p>\n\n\n\n<p>The supplier may support:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Equipment packing<\/li>\n\n\n\n<li>Container loading<\/li>\n\n\n\n<li>Shipping dimensions<\/li>\n\n\n\n<li>Packing lists<\/li>\n\n\n\n<li>Commercial invoices<\/li>\n\n\n\n<li>Export documentation<\/li>\n\n\n\n<li>Loading photographs<\/li>\n\n\n\n<li>Shipping coordination<\/li>\n<\/ul>\n\n\n\n<p>Large brewery vessels may require careful container planning because their dimensions and weight can significantly affect transportation costs.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">12. Installation Support<\/h2>\n\n\n\n<p>Turnkey does not necessarily mean that the manufacturer physically installs every component at the customer&#8217;s factory.<\/p>\n\n\n\n<p>The project scope should clearly state whether installation is:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Fully handled by the manufacturer<\/li>\n\n\n\n<li>Supervised by the manufacturer<\/li>\n\n\n\n<li>Supported remotely<\/li>\n\n\n\n<li>Performed by the buyer&#8217;s local contractor<\/li>\n<\/ul>\n\n\n\n<p>Installation support may cover:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Equipment positioning<\/li>\n\n\n\n<li>Piping connections<\/li>\n\n\n\n<li>Electrical connections<\/li>\n\n\n\n<li>Utility connections<\/li>\n\n\n\n<li>Sensor installation<\/li>\n\n\n\n<li>PLC connection<\/li>\n\n\n\n<li>Glycol system connection<\/li>\n\n\n\n<li>CIP connection<\/li>\n<\/ul>\n\n\n\n<p>For overseas projects, clear installation drawings and technical instructions can make local installation much easier.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">13. Commissioning and Operator Training<\/h2>\n\n\n\n<p>After installation, the brewery system needs to be tested under actual operating conditions.<\/p>\n\n\n\n<p>Commissioning may include:<\/p>\n\n\n\n<p><strong>Water testing \u2192 Utility testing \u2192 Equipment testing \u2192 Brewing trial \u2192 Temperature testing \u2192 CIP testing \u2192 Process adjustment<\/strong><\/p>\n\n\n\n<p>Operator training can then cover:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Brewhouse operation<\/li>\n\n\n\n<li>Fermenter operation<\/li>\n\n\n\n<li>Controllo della temperatura<\/li>\n\n\n\n<li>CIP procedures<\/li>\n\n\n\n<li>PLC operation<\/li>\n\n\n\n<li>Basic maintenance<\/li>\n\n\n\n<li>Safety procedures<\/li>\n<\/ul>\n\n\n\n<p>This stage helps the brewery team become familiar with the equipment before commercial production begins.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">14. What Is Usually Not Included?<\/h2>\n\n\n\n<p>One of the most important parts of evaluating a turnkey quotation is understanding what is <strong>not<\/strong> included.<\/p>\n\n\n\n<p>Depending on the supplier, the following may be outside the standard equipment package:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Brewery building<\/li>\n\n\n\n<li>Civil construction<\/li>\n\n\n\n<li>Drenaggio<\/li>\n\n\n\n<li>Local electrical installation<\/li>\n\n\n\n<li>Gas supply<\/li>\n\n\n\n<li>Steam boiler<\/li>\n\n\n\n<li>Air compressor<\/li>\n\n\n\n<li>Water treatment<\/li>\n\n\n\n<li>Packaging equipment<\/li>\n\n\n\n<li>Laboratory equipment<\/li>\n\n\n\n<li>Taxes and import duties<\/li>\n\n\n\n<li>International freight<\/li>\n\n\n\n<li>Local permits<\/li>\n\n\n\n<li>Local engineering approval<\/li>\n<\/ul>\n\n\n\n<p>Therefore, buyers should request a detailed scope of supply instead of assuming that \u201cturnkey\u201d means everything is included.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Turnkey Brewery vs Equipment Package<\/h2>\n\n\n\n<p>These two terms should not automatically be treated as the same.<\/p>\n\n\n\n<p>An equipment package may provide the major brewing vessels and basic accessories.<\/p>\n\n\n\n<p>A turnkey brewery project should provide a more integrated engineering solution.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Equipment Package<\/th><th>Turnkey Project<\/th><\/tr><\/thead><tbody><tr><td>Main vessels<\/td><td>Complete process design<\/td><\/tr><tr><td>Basic piping<\/td><td>Integrated piping design<\/td><\/tr><tr><td>Individual controls<\/td><td>Integrated automation<\/td><\/tr><tr><td>Equipment supply<\/td><td>Testing and commissioning support<\/td><\/tr><tr><td>Technical specifications<\/td><td>Drawings and documentation<\/td><\/tr><tr><td>Limited engineering<\/td><td>Project-level engineering<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>The exact definition should always be confirmed in the commercial quotation and technical agreement.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to Evaluate a Turnkey Brewery Supplier<\/h2>\n\n\n\n<p>When comparing suppliers, do not compare only the total price.<\/p>\n\n\n\n<p>Ask each manufacturer to provide a detailed scope covering:<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Equipment<\/h3>\n\n\n\n<p>What vessels and auxiliary equipment are included?<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Engineering<\/h3>\n\n\n\n<p>Are process diagrams, layout drawings and piping plans included?<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Automazione<\/h3>\n\n\n\n<p>What level of PLC and automatic control is included?<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Testing<\/h3>\n\n\n\n<p>What factory testing will be performed before shipment?<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Installation<\/h3>\n\n\n\n<p>Does the supplier provide installation supervision or commissioning?<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Documentation<\/h3>\n\n\n\n<p>Which technical and compliance documents are included?<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Assistenza post-vendita<\/h3>\n\n\n\n<p>How will technical issues be handled after the brewery starts production?<\/p>\n\n\n\n<p>A lower quotation may appear attractive but become more expensive if important systems or services are excluded.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Why Work with a Brewery Equipment Manufacturer?<\/h2>\n\n\n\n<p>A turnkey brewery project involves many interconnected systems.<\/p>\n\n\n\n<p>Working with a manufacturer that understands the complete brewing process can reduce coordination between different equipment suppliers.<\/p>\n\n\n\n<p>METO designs and manufactures brewery equipment and integrated brewing systems for different production scales and international markets.<\/p>\n\n\n\n<p>Depending on project requirements, METO can integrate:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Brewhouse systems<\/li>\n\n\n\n<li>Fermentation tanks<\/li>\n\n\n\n<li>Bright beer tanks<\/li>\n\n\n\n<li>Hot and cold water systems<\/li>\n\n\n\n<li>Glycol cooling<\/li>\n\n\n\n<li>CIP<\/li>\n\n\n\n<li>Process piping<\/li>\n\n\n\n<li>PLC automation<\/li>\n\n\n\n<li>Electrical control<\/li>\n\n\n\n<li>Factory testing<\/li>\n\n\n\n<li>Installation and commissioning support<\/li>\n<\/ul>\n\n\n\n<p>The system can be configured according to production capacity, beer styles, factory layout, utilities, automation requirements and future expansion plans.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"800\" height=\"600\" src=\"https:\/\/metobrew.com\/wp-content\/uploads\/2026\/03\/2000l-brewery-1.webp\" alt=\"Birrificio da 2000 litri (1)\" class=\"wp-image-4353\" srcset=\"https:\/\/metobrew.com\/wp-content\/uploads\/2026\/03\/2000l-brewery-1.webp 800w, https:\/\/metobrew.com\/wp-content\/uploads\/2026\/03\/2000l-brewery-1-768x576.webp 768w, https:\/\/metobrew.com\/wp-content\/uploads\/2026\/03\/2000l-brewery-1-16x12.webp 16w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">FAQ<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">What does a turnkey brewery equipment project include?<\/h3>\n\n\n\n<p>A turnkey project can include equipment design, brewhouse, fermentation, cooling, CIP, piping, automation, testing, documentation, installation support and commissioning. The exact scope depends on the supplier and project agreement.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Does turnkey brewery equipment include the building?<\/h3>\n\n\n\n<p>Usually not. Civil construction, drainage and building work are often handled locally unless specifically included in the contract.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Does a turnkey brewery include packaging equipment?<\/h3>\n\n\n\n<p>Not necessarily. Filling, kegging, canning and bottling systems should be clearly listed in the quotation if required.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Does the manufacturer install the brewery?<\/h3>\n\n\n\n<p>This depends on the project. Installation can be fully handled, supervised by the manufacturer or completed by a local contractor with technical support from the equipment manufacturer.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Is turnkey brewery equipment more expensive?<\/h3>\n\n\n\n<p>The initial equipment investment may be higher than purchasing individual vessels, but an integrated project can reduce coordination work and help ensure that the major systems are properly matched.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Conclusione<\/h2>\n\n\n\n<p>A turnkey brewery equipment project should be more than a collection of stainless steel tanks.<\/p>\n\n\n\n<p>It should connect process design, brewing equipment, fermentation, cooling, CIP, piping, automation, testing and commissioning into one coordinated system.<\/p>\n\n\n\n<p>Before placing an order, international buyers should ask for a detailed scope of supply and clearly identify what is included, what is optional and what must be provided locally.<\/p>\n\n\n\n<p>For a new brewery project, choosing an experienced brewery equipment manufacturer at the design stage can help ensure that the equipment, utilities, layout and automation work together from the beginning.<\/p>\n\n\n\n<p>If you are planning to build a brewery, <a href=\"https:\/\/metobrew.com\/it\/contact\/\" data-type=\"page\" data-id=\"237\">contact METO<\/a> with your target capacity, beer styles, available space and production requirements. We can help develop a brewery equipment solution based on your project needs.<\/p>\n\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Learn what a turnkey brewery equipment project includes, from brewhouse and fermentation to cooling, CIP, automation, testing, installation and commissioning.<\/p>","protected":false},"author":5,"featured_media":4677,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_robots_primary_cat":"none","_seopress_titles_title":"What Is Included in a Turnkey Brewery Equipment Project?","_seopress_titles_desc":"Learn what a turnkey brewery equipment project includes, from brewhouse and fermentation to cooling, CIP, automation, testing, installation and commissioning.","_seopress_robots_index":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"default","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[27],"tags":[46],"class_list":["post-5339","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-brewery-equipment"],"acf":[],"_links":{"self":[{"href":"https:\/\/metobrew.com\/it\/wp-json\/wp\/v2\/posts\/5339","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/metobrew.com\/it\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/metobrew.com\/it\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/metobrew.com\/it\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/metobrew.com\/it\/wp-json\/wp\/v2\/comments?post=5339"}],"version-history":[{"count":3,"href":"https:\/\/metobrew.com\/it\/wp-json\/wp\/v2\/posts\/5339\/revisions"}],"predecessor-version":[{"id":5342,"href":"https:\/\/metobrew.com\/it\/wp-json\/wp\/v2\/posts\/5339\/revisions\/5342"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/metobrew.com\/it\/wp-json\/wp\/v2\/media\/4677"}],"wp:attachment":[{"href":"https:\/\/metobrew.com\/it\/wp-json\/wp\/v2\/media?parent=5339"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/metobrew.com\/it\/wp-json\/wp\/v2\/categories?post=5339"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/metobrew.com\/it\/wp-json\/wp\/v2\/tags?post=5339"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}