{"id":5140,"date":"2026-08-06T15:44:19","date_gmt":"2026-08-06T07:44:19","guid":{"rendered":"https:\/\/metobrew.com\/?p=5140"},"modified":"2026-08-06T15:44:48","modified_gmt":"2026-08-06T07:44:48","slug":"large-brewery-design-from-capacity-planning-to-turnkey-delivery","status":"publish","type":"post","link":"https:\/\/metobrew.com\/it\/large-brewery-design-from-capacity-planning-to-turnkey-delivery\/","title":{"rendered":"\u00a0Large Brewery Design: From Capacity Planning to Turnkey Delivery"},"content":{"rendered":"<p><\/p>\n\n\n\n<p>The success of a large brewery is largely decided at the design stage. Equipment can be swapped out and piping rerouted, but the parts that are hard to change later \u2014 floor loading, utility capacity, the basic logic of the building \u2014 cost double the time and money if you get them wrong. This article walks through the decisions that matter in large brewery design: capacity planning, plant layout, equipment selection, automation, sanitary design, commissioning, and turnkey delivery.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">1. Capacity Planning: Brewhouse, Fermenters, and Refrigeration<\/h2>\n\n\n\n<p>The first ratio to lock down is the match between brewhouse output and fermentation and cold-storage capacity. The industry rule of thumb is 4:1 to 6:1 \u2014 total fermenter volume runs roughly four to six times daily brewhouse output. Where you land depends on your product mix. Lagers spend longer in fermenter and maturation, so you lean toward the higher multiple; breweries running fast-turnaround fresh beers can sit below 4x. People get this wrong more often than you&#8217;d think, usually by sizing against brewhouse batch volume alone and forgetting the fermentation cycle. The brewhouse can turn out four batches a day, but each tank holds beer for two to four weeks. Run out of tank space and the brewhouse sits idle waiting for an empty vessel.<\/p>\n\n\n\n<p>Annual capacity is a simple calculation, but the inputs have to be right:<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>Annual capacity \u2248 batches per day \u00d7 brewing days per year \u00d7 batch size \u00d7 brewhouse efficiency<\/p>\n<\/blockquote>\n\n\n\n<p>Take a 10-ton (100 hL) brewhouse as an example: four batches a day, 300 brewing days a year, and you&#8217;re looking at 4 \u00d7 300 \u00d7 10 = 12,000 tons of theoretical capacity. In practice, plan on an equipment utilization rate of 85\u201390% and allow for losses \u2014 first runnings, rinse water, transfer heel \u2014 all of it eats into real output.<\/p>\n\n\n\n<p>Utilities follow capacity, not the other way around. Size the steam system for peak load during the boil, the most steam-hungry part of the day. The water balance has to cover brewing water, CIP water, and cooling water recovery. Electrical capacity must handle the starting loads of both the refrigeration plant and the packaging line, which are big draws. And drainage is the most overlooked item of all: every batch produces a large volume of hot effluent, so drain counts and trench sizes have to be sized for peak flow. A system designed for average flow is the first thing to fail in continuous production.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">2. Plant Layout: Supporting Clean, Safe Production<\/h2>\n\n\n\n<p>Layout is fundamentally about zoning. Five functional blocks \u2014 raw materials, the hot side (brewhouse), the cold side (fermentation and cellar), packaging, and utilities \u2014 need to be effectively separated, independent yet sensibly connected for material flow. Raw materials storage must be dry and protected; malt that picks up moisture is trouble from the milling stage onward. The cold side has the strictest microbial standards, so foot and material traffic should never route back from the cold side through the hot side. Whether you move dirty-to-clean or clean-to-dirty sets the hygiene ceiling for the whole plant.<\/p>\n\n\n\n<p>A few details that matter:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Floor slope<\/strong>: all wet areas slope to floor drains, generally no less than 1.5\u20132%, steeper around tank washdown areas. Standing water breeds odors and microbes. This is hygiene enforced at the physical level, more reliable than any management policy.<\/li>\n\n\n\n<li><strong>Ventilation<\/strong>: the hot side has to handle boil steam \u2014 exhaust hoods plus mechanical ventilation, or the brewhouse runs in permanent steam, corroding steelwork and shortening the life of electrical equipment. The cold side has to deal with CO2, which is heavier than air and settles in low spots, so fermentation and cellar rooms need low-level exhaust points.<\/li>\n\n\n\n<li><strong>Hygiene zoning<\/strong>: CIP and bottling areas are kept under positive pressure to keep dust and microbes out.<\/li>\n\n\n\n<li><strong>People and materials<\/strong>: raw material intake and finished goods dispatch should be separate, with clean and dirty flows kept apart wherever possible.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">3. Choosing a Brewhouse System: Scalable Brewing<\/h2>\n\n\n\n<p>The four-vessel system \u2014 mash tun, lauter tun, brew kettle, whirlpool \u2014 is the mainstream choice for large breweries. Four vessels work in parallel with a tight batch cadence: the previous batch is still lautering while the next one is already mashing in. Two- and three-vessel systems cost less and take up less floor space, but the same vessels handle several jobs in sequence, which drags down batch efficiency. They suit low-volume breweries with frequent recipe changes. For a plant doing 10,000 tons or more a year, the extra investment in a four-vessel system usually pays for itself within a year or two in improved capacity utilization.<\/p>\n\n\n\n<p>Process details set the ceiling on beer quality:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>High-shear mashing<\/strong>: vigorous agitation and fast temperature ramps give thorough gelatinization and efficient enzymatic conversion, batch after batch.<\/li>\n\n\n\n<li><strong>Low-oxygen transfer<\/strong>: minimize oxygen pickup during wort transfer and cooling. Dissolved oxygen in hot wort directly shapes the oxidized flavors of the finished beer \u2014 this is one step you can&#8217;t skip.<\/li>\n\n\n\n<li><strong>Steam jacket control<\/strong>: zoned jackets with precise temperature control avoid localized scorching and burnt flavors, and keep heating rates from dragging out batch time.<\/li>\n<\/ul>\n\n\n\n<p>On the automation side, pumps get variable frequency drives (VFDs) to control flow, and flow meters on the lines provide accurate metering. Once grist loading, sparge volumes, and lauter speeds are all parameterized, operator skill stops being a variable in product quality.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Vessel Configuration vs. Daily Cadence<\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td><strong>System Type<\/strong><\/td><td><strong>Vessel Breakdown<\/strong><\/td><td><strong>Daily Knockout Capacity<\/strong><\/td><td><strong>Operational Suitability<\/strong><\/td><\/tr><\/thead><tbody><tr><td><strong>2-Vessel<\/strong><\/td><td>Mash\/Lauter + Kettle\/Whirlpool<\/td><td>2\u20134 brews\/day<\/td><td>Compact footprint, low initial CAPEX. High process hold times; best for smaller operations or brewpubs.<\/td><\/tr><tr><td><strong>3-Vessel<\/strong><\/td><td>Mash + Lauter + Kettle\/Whirlpool<\/td><td>4\u20136 brews\/day<\/td><td>Balanced flexibility. Allows mashing the subsequent batch while the current batch is lautering.<\/td><\/tr><tr><td><strong>4-Vessel<\/strong><\/td><td>Mash + Lauter + Kettle + Whirlpool<\/td><td>8\u201312 brews\/day<\/td><td>Standard industrial configuration. Fully independent unit operations offering maximum batch turnover.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">4. Automation and Control: Consistent Quality<\/h2>\n\n\n\n<p>Digitizing recipes is the first step in automation. Mash temperature profiles, rest times, boil duration, hop addition points \u2014 all of it lives in the control system as stored recipes. The scheduler sequences batches automatically and operators work from screen prompts instead of memory. Pump interlocks are the safety floor: if a valve is in the wrong position, the pump refuses to start, preventing hot wort backflow or overpressured lines. Alarm logic surfaces problems early \u2014 temperature drift, flow anomalies, level errors \u2014 before they grow into a ruined batch.<\/p>\n\n\n\n<p>The value of data monitoring is in the accumulation. Record flow, temperature, and gravity data for every batch, and within a few months the trends appear: which step varies most, which piece of equipment is drifting. Process optimization runs on data, not on how it feels. Cross-referencing historical batches with finished-product results will even point to which parameter combinations are most likely to cause problems.<\/p>\n\n\n\n<p>The integration requirement is clear: one control platform covering the hot side, cold side, and packaging. Plenty of breweries have excellent hot-side automation but still record fermentation and packaging by hand, and that gap makes traceability fall apart when a quality issue surfaces. A single platform with automatically generated, electronically signed batch records is the most fundamental difference between a large brewery and a microbrewery in management terms \u2014 and it&#8217;s what gets you through food safety audits.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">5. Sanitary Piping, Valves, and CIP: The Hygiene Foundation<\/h2>\n\n\n\n<p>Piping quality is the first line of hygiene defense. Orbital welding produces smooth interior weld surfaces with no slag or discoloration; even skilled manual welders can&#8217;t match that interior quality. Lines are sloped for complete drainage \u2014 generally at least 1%, more on critical lines. Every low point gets a drain, and every long branch line gets assessed for dead legs. Residual liquid trapped in a dead leg is a breeding ground for microbes, so it should be eliminated at the design stage rather than &#8220;washed out&#8221; by CIP later.<\/p>\n\n\n\n<p>CIP systems have to be verified, not assumed. Rotating spray balls cover more surface than fixed ones, and block-and-bleed valve assemblies prevent cleaning solution from cross-contaminating product \u2014 they&#8217;re standard in sanitary valve groups. Verification happens on three levels: sight glasses to check spray coverage; conductivity to confirm that the caustic, acid, and rinse stages are displacing each other completely, which the conductivity curve shows at a glance; and microbial testing \u2014 swab samples and rinse cultures \u2014 to confirm the cleaning actually worked. CIP counts as effective only when all three levels pass.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"800\" height=\"600\" src=\"https:\/\/metobrew.com\/wp-content\/uploads\/2026\/06\/5000l.webp\" alt=\"5000l\" class=\"wp-image-4905\" srcset=\"https:\/\/metobrew.com\/wp-content\/uploads\/2026\/06\/5000l.webp 800w, https:\/\/metobrew.com\/wp-content\/uploads\/2026\/06\/5000l-768x576.webp 768w, https:\/\/metobrew.com\/wp-content\/uploads\/2026\/06\/5000l-16x12.webp 16w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">6. Glycol, Temperature Control, and Utility Integration<\/h2>\n\n\n\n<p>Glycol is the heart of the cold side, and three things matter. Size the main glycol headers for peak cooling load, not average \u2014 the system has to survive the hottest days when fermentation is at its most concentrated. Insulate every branch line properly; more than one brewery has lost half its cooling capacity in the pipes. And give every fermenter branch a balancing valve, or near tanks cool fast while far tanks never come down to temperature \u2014 the classic problem with parallel systems.<\/p>\n\n\n\n<p>Temperature control follows the process in stages: constant temperature through primary fermentation, a fast drop to maturation temperature, then holding cold. Each stage needs different glycol flow and temperature, and the control system has to switch automatically.<\/p>\n\n\n\n<p>The &#8220;invisible&#8221; utilities \u2014 steam, compressed air, power \u2014 need forward-looking planning and documentation. Steam lines sized for peak flow. Compressed air split into instrument air and process air so they don&#8217;t interfere. Electrical capacity with room for expansion, since transformers and main feeders are the hardest things to upgrade later. Utility drawings are the core of turnkey delivery: they&#8217;re the most expensive thing to change after the fact, and a week spent designing them properly up front saves a month of retrofitting later.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">7. Packaging Systems and Material Flow<\/h2>\n\n\n\n<p>The packaging line can be summed up in six words: short, straight, and buffered. The shorter the run from bright beer tank to filler, the lower the line losses and residual product. Between filling, crowning, labeling, packing, and palletizing, you need buffer zones \u2014 when one machine stops briefly, the rest of the line doesn&#8217;t cascade into a full shutdown. A packaging line without buffers turns one small equipment fault into a whole-line stoppage.<\/p>\n\n\n\n<p>Equipment considerations: filling and sealing stability sets overall line efficiency, and this is the biggest chunk of packaging investment, so prioritize the supplier&#8217;s service network and spare parts availability during selection. Inline QA \u2014 fill level, seal integrity, metal detection \u2014 keeps defective product out before it ships, rather than relying on spot checks and luck. Cleanability matters just as much: a packaging line handles beer and containers all day, and any structure that traps product is a quality risk. Think through the disassembly and cleaning access of fillers, conveyors, and labelers at the design stage.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">8. Microbrewery vs. Large Brewery: Design Differences<\/h2>\n\n\n\n<p>The differences are a chain reaction of scale: equipment size, degree of automation, QA demands, warehouse space, and regulatory requirements \u2014 ventilation, wastewater, fire, noise \u2014 a large brewery faces all of them. A microbrewery can buy a skid-mounted system; a large brewery gets a custom-engineered project. Micros have people watching the parameters; large breweries have systems managing them.<\/p>\n\n\n\n<p>But the fundamentals are identical: clean\/dirty separation, cleanable surfaces, safe traffic flow. These principles hold just as true in a 30-ton-per-batch plant as in a 500-liter pilot brewhouse. The most common mistake when a small brewery scales up is scaling up its old practices unchanged \u2014 what gets scaled up isn&#8217;t the equipment, it&#8217;s the problems. Management gaps that two or three experienced brewers can paper over at small scale become visible and expensive at scale.<\/p>\n\n\n\n<p><strong>Microbrewery vs. Industrial Brewery: Key Engineering Differences<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td><strong>Parametro<\/strong><\/td><td><strong>Microbrewery \/ Craft<\/strong><\/td><td><strong>Industrial Large Brewery<\/strong><\/td><\/tr><\/thead><tbody><tr><td><strong>Batch Scale<\/strong><\/td><td>5\u201330 HL per brew (2- or 3-vessel)<\/td><td>100\u20131000+ HL per brew (4-vessel \/ modular)<\/td><\/tr><tr><td><strong>Livello di automazione<\/strong><\/td><td>Semi-automated \/ Manual manifold panels<\/td><td>Fully automated DCS \/ Recipe-driven execution<\/td><\/tr><tr><td><strong>Controllo qualit\u00e0<\/strong><\/td><td>Basic gravity, pH, and optical microscopy<\/td><td>Gas Chromatography, inline CO2 analyzers, full micro labs<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">9. Building in an Existing Facility: Prefabrication, Drains, and Ventilation<\/h2>\n\n\n\n<p>Retrofits start with investigation, not design. Can the floor slab carry a full fermenter? Thirty tons of beer plus vessel and insulation weighs more than most people expect. Is there enough electrical capacity? Can gas be connected? Where will the ventilation run? Confirm all of it before any design work.<\/p>\n\n\n\n<p>Key retrofit items: re-sloping the floors, the most commonly &#8220;saved&#8221; item in retrofit projects and the one that leaves you standing in puddles; widening and deepening drainage channels, because batch effluent from a brewhouse far exceeds what a standard industrial building was designed for and undersized channels turn the floor into a pond; treating gas areas to explosion-proof standards with electrical, ventilation, and gas detection; and exhaust hoods over the brew kettle to catch steam at the source.<\/p>\n\n\n\n<p>Existing-facility projects are most dangerous when people settle for &#8220;good enough.&#8221; There is no &#8220;good enough&#8221; for structural loading or explosion safety \u2014 there&#8217;s no do-over.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">10. Commissioning, Ramp-Up, and Minimizing Downtime<\/h2>\n\n\n\n<p>Phased installation is how you control risk: receiving, positioning, anchoring, piping connections, individual machine testing, then system commissioning \u2014 with sign-off at each step before moving on. The point is to solve problems where they occur rather than letting them pile up for one catastrophic final week.<\/p>\n\n\n\n<p>Commissioning runs in two stages: water trials first, then beer trials. Water trials verify leaks, pump rotation, valve operation, and instrument readings. If you don&#8217;t do this thoroughly, what leaks during beer trials is beer, not water. Beer trials are where real process problems surface: lauter speed, cooling efficiency, fermentation temperature control. Write your SOPs and preventive maintenance (PM) plans during commissioning rather than after \u2014 they evolve as you tune the plant, and they&#8217;re essentially finished by the time commissioning wraps up. Take the ramp-up slowly: confirm batch-to-batch stability before pushing volume. First-month production records matter less than getting the process right.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">11. Staffing, Training, and Brewing Materials<\/h2>\n\n\n\n<p>The team revolves around four roles: core operators (two to three per shift, covering brewhouse, fermentation, and CIP), a brewer who owns the process and final product quality, a maintenance engineer for utilities and equipment, and QA for sampling, testing, and batch record review. It&#8217;s not about headcount \u2014 it&#8217;s about backup for critical roles. The process can&#8217;t stop when the brewer is on vacation.<\/p>\n\n\n\n<p>Training comes down to three things. A mentorship system, because new hires learn fastest working alongside experienced staff. Documented SOPs, so &#8220;how to do the job&#8221; is written down and inspectable rather than passed along by word of mouth. And changeover drills, because product changeover is where most errors happen \u2014 incomplete cleaning, forgotten parameter changes, wrong labels. Practicing beats remediating every time.<\/p>\n\n\n\n<p>Don&#8217;t skimp on inventory: spare parts (mechanical seals, gaskets, valve diaphragms) and cleaning chemicals (caustic, acid, sanitizer) need safety stock. Waiting on a single gasket can cost a full day of production.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"800\" height=\"600\" src=\"https:\/\/metobrew.com\/wp-content\/uploads\/2026\/06\/5000l-brewery.2.webp\" alt=\"5000l brewery.2\" class=\"wp-image-4906\" srcset=\"https:\/\/metobrew.com\/wp-content\/uploads\/2026\/06\/5000l-brewery.2.webp 800w, https:\/\/metobrew.com\/wp-content\/uploads\/2026\/06\/5000l-brewery.2-768x576.webp 768w, https:\/\/metobrew.com\/wp-content\/uploads\/2026\/06\/5000l-brewery.2-16x12.webp 16w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">12. From Design Consulting to Turnkey Delivery<\/h2>\n\n\n\n<p>Projects move through four phases: design consulting, engineering, procurement and manufacturing, and turnkey delivery. Three things get confirmed at every phase: scope, budget, and safety. Scope changes mean contract and drawing updates in parallel; budget overruns should be flagged early, not at the final reckoning; and safety is non-negotiable.<\/p>\n\n\n\n<p>Communication with stakeholders \u2014 owner, design firm, equipment supplier, contractors \u2014 runs through the whole project. Information lag on any side turns into rework on site. A weekly project meeting keeps progress, changes, and risks on the table.<\/p>\n\n\n\n<p>What you finally receive is a complete documented system: P&amp;IDs, operation manuals, SOPs, spare parts lists, as-built drawings, and training records. That documentation is the real value of a turnkey project. Equipment depreciates, but the drawings and documents keep working for decades.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Conclusione<\/h2>\n\n\n\n<p>A brewery is not a collection of equipment \u2014 it&#8217;s an interconnected system. Capacity matching, hygiene zoning, automated batch records, phased commissioning, trained operators: every link in the chain comes due on the day you start production. The breweries that launch on schedule and hold their quality are the ones that thought these questions through at the drawing stage. If that&#8217;s the project you&#8217;re planning, <a href=\"https:\/\/metobrew.com\/it\/contact\/\" data-type=\"page\" data-id=\"237\">we&#8217;d be glad to walk through it with you.<\/a><\/p>\n\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Practical large brewery design guide: capacity planning, fermenter sizing, sanitary piping, CIP, automation, turnkey commissioning for new plants and expansions.<\/p>","protected":false},"author":5,"featured_media":4904,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_robots_primary_cat":"none","_seopress_titles_title":"\u00a0Large Brewery Design: From Capacity Planning to Turnkey Delivery","_seopress_titles_desc":"Practical large brewery design guide: capacity planning, fermenter sizing, sanitary piping, CIP, automation, turnkey commissioning for new plants and expansions.","_seopress_robots_index":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"default","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[27],"tags":[46],"class_list":["post-5140","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-brewery-equipment"],"acf":[],"_links":{"self":[{"href":"https:\/\/metobrew.com\/it\/wp-json\/wp\/v2\/posts\/5140","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/metobrew.com\/it\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/metobrew.com\/it\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/metobrew.com\/it\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/metobrew.com\/it\/wp-json\/wp\/v2\/comments?post=5140"}],"version-history":[{"count":3,"href":"https:\/\/metobrew.com\/it\/wp-json\/wp\/v2\/posts\/5140\/revisions"}],"predecessor-version":[{"id":5143,"href":"https:\/\/metobrew.com\/it\/wp-json\/wp\/v2\/posts\/5140\/revisions\/5143"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/metobrew.com\/it\/wp-json\/wp\/v2\/media\/4904"}],"wp:attachment":[{"href":"https:\/\/metobrew.com\/it\/wp-json\/wp\/v2\/media?parent=5140"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/metobrew.com\/it\/wp-json\/wp\/v2\/categories?post=5140"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/metobrew.com\/it\/wp-json\/wp\/v2\/tags?post=5140"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}